8-K current report · filed May 15, 2026

Otter Tail Corp (OTTR) 8-K Current Report: May 15, 2026

Short answer

Otter Tail Corp (OTTR) filed an 8-K current report with the SEC on May 15, 2026 reporting Item 8.01 (Other Events). OTP’s 15-year preferred plan adds 50 MW natural gas capacity by 2031–2032 and two 50 MW wind facilities by 2035 and 2040.

Otter Tail Corp 8-K event analysis

AI summary of each reported item and its exhibits

Item 8.01 · Other Events

  • OTP’s 15-year preferred plan adds 50 MW natural gas capacity by 2031–2032 and two 50 MW wind facilities by 2035 and 2040
  • Existing expansion pipeline includes 50 MW Solway Solar in 2026, 295 MW Abercrombie Solar in 2028, 75 MW battery storage, and additional wind
  • Minnesota Coyote Station capacity and energy exit targeted by December 31, 2031, increasing transition away from coal
  • MPUC review creates regulatory and execution risk around resource selection, timing, and financial impact

Generated from the filing text and exhibits; verify against the original. What 8-K item codes mean

Other Otter Tail Corp 8-K filings

Get the next OTTR 8-K as it lands

Follow OTTR for push alerts, or ask the research agent what this filing means.