Ramaco Resources, Inc. (METC) 8-K Current Report: July 29, 2026

Item 7.01Item EX-99.1METC overview

Short answer

Ramaco Resources, Inc. (METC) filed an 8-K current report with the SEC on July 29, 2026 reporting Item 7.01 (Regulation FD Disclosure), Item EX-99.1 (Exhibit EX-99.1). Boilerplate Regulation FD disclosure language only.

Ramaco Resources, Inc. 8-K event analysis

AI summary of each reported item and its exhibits

Item 7.01 · Regulation FD Disclosure

  • Boilerplate Regulation FD disclosure language only
  • No substantive operating, financial, or strategic information for investors
  • Filing content does not identify a material event or market-moving disclosure

Item EX-99.1 · Exhibit EX-99.1

  • Hatch Initial Assessment advances Brook Mine’s greenfield critical-minerals project using carbo-chlorination to recover gallium, germanium, scandium and rare earth elements
  • Base case processes 1.3 million dry metric tonnes annually at 92% availability, with 574 dry tonnes of CMO-equivalent output targeted
  • Byproduct targets include 11,848 tonnes of HPA and 18,617 tonnes of HPS annually, materially above the original 1,800-tonne HPA target
  • Economic confidence remains early-stage, with AACE Class 5 CAPEX accuracy of +30%/-50% and key process test work scheduled to begin September 2026
  • Project economics and design remain exposed to unresolved technology, permitting, infrastructure, waste-management and tailings requirements

Generated from the filing text and exhibits; verify against the original. What 8-K item codes mean