10-K annual report · filed Mar 15, 2017

International Tower Hill Mines Ltd (THM) FY2016 10-K Annual Report

Short answer

International Tower Hill Mines Ltd (THM) filed its fiscal 2016 10-K annual report with the SEC on Mar 15, 2017.

  • Top risk flagged: TSX delisting review, following December 2016 private placement using a financial-hardship exemption, completion expected before April 2017

FY2016 key financial metrics · XBRL

Net income
−$7M
ROE
-11.4%
Operating cash flow
−$6M

Source: XBRL data from the International Tower Hill Mines Ltd (THM) FY2016 10-K on SEC EDGAR. USD.

International Tower Hill Mines Ltd FY2016 10-K analysis

AI summary of each section, grounded in the filing text

Business Overview

  • Exploration-stage gold company, focused exclusively on optimizing and advancing 100%-owned Livengood Gold Project in Alaska
  • October 2016 Study selected 52,600-tonnes-per-day configuration, targeting 6.8 million ounces over 23 years
  • Strategic shift toward lower-scale, lower-cost project: CAPEX reduced 34% to $1.84 billion versus 2013 feasibility study
  • Process OPEX reduced 28% to $7.48 per ton, with all-in costs of $1,247 per ounce
  • $22.0 million private placement funded $14.7 million Livengood claim acquisition and continued optimization work

Management Discussion & Analysis

  • No revenue-generating operations; net loss $7.19M vs $4.81M in 2015
  • Net loss increase driven by $1.08M other expense vs $1.64M other income
  • Livengood project: CAPEX $1.84B, down 34% or $950M; process OPEX $7.48 per ton
  • Cash $22.47M vs $6.49M; $21.85M financing proceeds and $6.5M project expenditures
  • 2017 budget $6.3M; significant additional financing required, with strategic alliance under consideration

Risk Factors

  • TSX delisting review, following December 2016 private placement using a financial-hardship exemption, completion expected before April 2017
  • Gold price $1,204 per ounce versus $1,250 needed for minimal positive return, making Livengood commercially nonviable
  • Livengood’s unpatented federal and Alaska mining claims face validity challenges under the U.S. General Mining Law of 1872
  • NEPA permitting requires an Environmental Impact Statement process, potentially delaying or preventing Livengood construction
  • No operating revenue or cash flow, with additional financing required for permitting and mine construction

Generated from the filing text; verify against the original. How to read a 10-K

Other International Tower Hill Mines Ltd annual reports

Ask about this 10-K

Compare years, dig into a risk factor or check the numbers against insider trades and fund holders.